CI / check (push) Waiting to run
The plan's two status lines both predated the gate's second run. The header still read "approved to start Phase 0a" nine phases in, and the DAG note still claimed the re-run had not happened and that phase 6 waits on a passing results file. That file has existed since 2026-07-26 — screenshare-audio-exclusion-phase5-results.md records GATE PASSED on run 2 with all 13 §5.1 rows, including rows 4 and 5 at the real tagging sites. Both lines now state what actually blocks phase 6: the 0c -> 0d -> 6 edge, with 0c step 2 still open (S1/S2 merged, S3a built but unmerged, S3b/S4/S5 not started) and 0d unbuilt. The superseded 2026-07-25 note is kept for the trail rather than deleted. Docs only; no code or gate changes. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>