docs: correct contacts-plan status header (was 'SCOPED, not started')
Flagged by the 2026-06-15 Codex/GPT-5.5 review (backlog A20): the header contradicted the per-phase statuses showing P1-P3 done + P4 partial. Now reads 'IN PROGRESS' with the current phase rollup. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -1,8 +1,11 @@
|
||||
# Friends-first contacts + ephemeral rooms (W7, redesigned) — plan / scope contract
|
||||
|
||||
**Status:** SCOPED, not started. **Model locked 2026-06-15** after an extended
|
||||
design session with the user. This is the scope contract; update it as phases
|
||||
land. Source: wishlist **W7**.
|
||||
**Status (2026-06-15):** IN PROGRESS. Model locked after an extended design
|
||||
session; **P1 (identity) + P2 (friends store) + P3 (member tickets) DONE & 2-machine
|
||||
field-verified; P4 (idle listener) pure core + wire transport DONE, live
|
||||
integration NOT wired; P5 UI partial.** See the per-phase "Core primitives" section
|
||||
below for exact status and `handoff.md` for the live summary. This is the scope
|
||||
contract; update it as phases land. Source: wishlist **W7**.
|
||||
|
||||
> **This doc supersedes two earlier drafts:** (1) the heavyweight "port pixelpass's
|
||||
> always-on control plane + reachable identity + n0 discovery" cut, and (2) the
|
||||
|
||||
Reference in New Issue
Block a user